Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:1004
Date: 2023-10-14
Agency:Other
Trail: Round Mountain - CSUCI
Leader:Jerry Mitcham
Hours: 80
Volunteers:16
Distance:3168
Status: Completed
Regulars: 16
Casuals: 0
pdf:20231014RoundMtn.pdf
CSUCI: 0
Tag:CSUCI_TC
Previous Events on this Trail
ID Date Leader Hours
10042023-10-14Jerry Mitcham80.5
Crew Member Hours
Barry Dydyk5.00
Carlyn Taggart5.00
Christopher Ramirez5.00
Cindy Kimmick4.50
Dave Edwards5.00
Denise Pomonik5.00
George Sherman5.00
Greg Sweel5.00
Jerry Mitcham5.50
John Kross5.00
Jon Sheldon5.50
Jon Van Gorder4.00
Juan Carlo Mendoza5.00
Krista Smith5.00
Ruth Feldon5.50
Solomon Adams5.00
This was the fourth annual Sat’wiwa Round Mountain Restoration Project. The object of this ongoing project is to restore and maintain the Round Mountain Tail on the CSUCI Campus. There were approximately 50 CSUCI student volunteers, thirteen SMMTC volunteers and three Trail Corps members. The SMMTC trail crew and the CSUCI Trail Corps met at the trail head on Round Mountain Road. Held project briefings and safety talk. Four of the SMMTC crew deployed with gas power tools, followed by a few others to begin work on the trails. The Trail Corps and remaining SMMTC crew remained at the trail head to meet with the student volunteers.. Student/facility volunteers arrived at the trail head. Opening ceremonies, introductions and Chumash blessing were conducted. The volunteers were divided into two equal sized groups. Group one was further divided into three crews for work assignments. One small crew of 6, was assigned to invasive plant removal. The other two crews of approximately 12 volunteers each were assigned to perform trail clean-up. The small crew cut and bagged Russian Thistle which was going to seed and seed pods from Fennel near the trail. The two larger crews raked up and removing cutting from the trail left behind by the earlier SMMTC work crew. The three crew returned to the trail head and were replaced by three similar crews from group 2. These crews continued the work started by the earlier three crews. All crews completed work and returned to the trail head. Closing ceremonies and lunch were conducted. All tools were loaded back into the trucks. Sat’wiwa project complete. Four volunteers transported tools back to the storage unit in Newbury Park and stored the tools.
Crew: Ruth Feldon, Dave Edwards, Carlyn Taggart, Jon Sheldon, Juan Carlo Mendoza, Greg Sweel, Barry Dydyk, Jon Van Gorder, Cindy Kimmick, John Kross, Jerry Mitcham, Denise Pomonik, George Sherman
3 images, scroll down to see susbsequent images.image from our trail work eventimage from our trail work eventimage from our trail work event