Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:1009
Date: 2023-11-01
Agency:State Parks
Trail: Musch Trail
Leader:Jerry Mitcham
Hours: 36
Volunteers:9
Distance:100
Status: Completed
Regulars: 7
Casuals: 2
pdf:20231101MuschTrail.pdf
CSUCI: 0
Tag:TSP, BBT
Previous Events on this Trail
ID Date Leader Hours
10092023-11-01Jerry Mitcham36.0
10082023-10-31Jerry Mitcham10.0
9342023-03-18Jerry Mitcham65.0
9332023-03-08Jerry Mitcham66.0
9322023-03-04Jerry Mitcham78.0
9312023-03-01Jerry Mitcham15.0
7272020-02-29Greg Sweel57.5
4482016-12-03Dave Edwards60.0
2672014-11-01Dave Edwards42.0
1742013-10-05Barb Thomas81.0
132011-10-2318.0
122011-10-2272.0
172011-10-2230.0
Crew Member Hours
Carlyn Taggart4.00
Dave Edwards4.00
Denise Pomonik4.00
Jerry Mitcham4.00
John Reynolds4.00
Jon Sheldon4.00
Ruth Feldon4.00
This was a special project to repair trail damage resulting from last winter's heavy rains. This area was worked in the spring, but this one spot could not be repaired at that time due to standing water and heavy mud. The area was now completely dried out and ready for remedial work. There were nine SMMTC volunteers present. One member of the Sierra Club Task force was also present. State Parks staff provided invaluable support, in preparation for and execution of the project. Met at the parking lot at Trippet Ranch. Conducted project, and safety briefings. Hiked approximately .25 miles to the work site on the Musch Trail. The project involved replacing one old water bar and construction of two new timber steps filled with crush (gravel). The State Park employees had already prepositioned materials at the work site. This saved the volunteer crew probably several hours of additional work. The remains of an old water bar timber was removed and replaced by a new timber and the drain was reshaped and groomed to provide effective drainage. Two new eight inch steps, with seven foot landings and side rails were installed. The landing areas were filled with crush and topped with soil. One new rock step was installed at a nearby location. Minor other trail grooming was performed in the immediate area. Completed work and hiked back to the meeting place. Project complete. Total volunteer hours: 9 Volunteers x 4.0 hours = 36.0 hours Feet of trail maintained: 100
Crew: Ruth Feldon, Dave Edwards, Jon Sheldon, Carlyn Taggart, Jerry Mitcham, John Reynolds, Denise Pomonik
2 images, scroll down to see susbsequent images.image from our trail work eventimage from our trail work event