Event#: | 472 |
Date: | 2017-03-18 |
Agency: | COSCA |
Trail: | COSCA Spring Work Day |
Leader: | John Kross |
Hours: | 72 |
Volunteers: | 12 |
Distance: | 2770 |
Status: | Completed |
Regulars: | 10 |
Casuals: | 2 |
pdf: | 20170318COSCASpring.pdf |
CSUCI: | 0 |
Tag: | |
Previous Events
ID |
Date |
Leader |
Hours |
631 | 2019-04-06 | John Kross | 20.0 |
628 | 2019-03-16 | John Kross | 32.0 |
629 | 2019-03-13 | John Kross | 12.0 |
472 | 2017-03-18 | John Kross | 72.0 |
391 | 2016-03-19 | Jerry Mitcham | 60.0 |
309 | 2015-03-21 | Jerry Mitcham | 55.0 |
308 | 2015-03-19 | Jerry Mitcham | 12.0 |
Crew Member |
Hours |
Anne Russell | 4.00 |
Barry Dydyk | 4.00 |
Dave Edwards | 4.00 |
Don Brusselars | 4.00 |
George Sherman | 4.00 |
Greg Sweel | 4.00 |
Jerry Mitcham | 4.00 |
John Kross | 4.00 |
Norm Simmonds | 4.00 |
Sharon Simmonds | 4.00 |
Annual Spring Trail Work event during which Trails Council crew leaders survey and flag work areas prior to the event and lead crews on the day of the event. Volunteers met at the Conejo Canyons trailhead on Conejo Center Drive. After registration, at 8a.m. volunteers were divided into teams that ranged between 6 and 14 people, were assigned their tools, and hiked to their designated work area.
The following work was completed:
Team 1: Filled-in severely eroded ~50 foot section of trail
Built rock wall and improved drainage to prevent future erosion
Team 2: Cut in trail re-route to get around a very muddy creek area ~400 feet
Team 3: Brushed, removed slough, widened bench in places in order to bring trail back to min. 4
feet of bench width (this is an equestrian trail) ~800 feet
Team 4: Filled in trenched areas, cut in or restored 8 water bars ~1,500 feet
Additional work accomplished
Filled in deep trench at the junction of Hawk Cny trail and Hawk Cny fire road ~20 feet
Work completed, everyone hiked back for a lunch provided by COSCA rangers.
Total Volunteer Hours: 65 volunteers 4 hours = 260 Hours
Feet of trail Maintained: 2,770 feet