Event#: | 475 |
Date: | 2017-04-01 |
Agency: | NPS |
Trail: | BBT, Trancas Canyon Rd., NPS |
Leader: | Jerry Mitcham |
Hours: | 78 |
Volunteers: | 13 |
Distance: | 1000 |
Status: | Completed |
Regulars: | 9 |
Casuals: | 4 |
pdf: | 20170401BBT_Encinal.pdf |
CSUCI: | 4 |
Tag: | BBT,CSUCI |
Previous Events
ID |
Date |
Leader |
Hours |
475 | 2017-04-01 | Jerry Mitcham | 78.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Norm Simmonds | 6.00 |
Sharon Simmonds | 6.00 |
This was a regularly scheduled trail maintenance event. This section of trail is the last land acquisition to complete the Backbone Trail. At the time of acquisition, there was minimal work done to convert the existing social trail into a maintained trail. It still needs additional work to bring it up to the BBT standard.. There were thirteen volunteers present; nine SMMTC volunteers and four CSUCI volunteers. Met at the Yellow Gate on Encinal Canyon. We carpooled/caravanned to the trail head. Conducted toll talk and safety briefings. Began work at the trail head working in an easterly direction. We chopped weeds and light brush along the trail to create a four foot tread. We did minor lopping, mainly to increase overhead clearance for the equestrians. We cleaned out several drains and installed several new drains. Filled a short stretch of trench in the trail. Total volunteer hours: 13 volunteers x 6 = 78 hours Feet of trail maintained: 1,000 ft.