Event#: | 658 |
Date: | 2019-06-22 |
Agency: | State Parks |
Trail: | Ray Miller Trail |
Leader: | Dave Edwards |
Hours: | 66 |
Volunteers: | 11 |
Distance: | 5300 |
Status: | Completed |
Regulars: | 10 |
Casuals: | 1 |
pdf: | 20190622RayMillerTrail.pdf |
CSUCI: | 0 |
Tag: | PMSP, BBT |
Previous Events
ID |
Date |
Leader |
Hours |
658 | 2019-06-22 | Dave Edwards | 66.0 |
512 | 2017-10-11 | Norm Simmonds | 30.0 |
506 | 2017-09-14 | Dave Edwards | 12.0 |
505 | 2017-09-13 | Norm Simmonds | 60.0 |
394 | 2016-03-26 | Dave Edwards | 66.0 |
214 | 2014-03-12 | Norm Simmonds | 48.0 |
60 | 2012-05-16 | | 54.0 |
48 | 2012-04-18 | | 49.5 |
34 | 2012-02-08 | | 49.5 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Jon Sheldon | 6.00 |
Norm Simmonds | 6.00 |
Location: Ray Miller trail, Point Mugu State Park Crewleader: Dave Edwards (SMMTC) Summary: We split up into two groups: One group consisted of 5 people who, after driving to the top of the Ray Miller trail where it meets the Overlook fire road, worked from there going down the trail. This group 5 used two hedge trimmers to cut back weeds and brush growing into the trail and had three followers raking and clearing the trail of cuttings. About 2100 ft of trail was cleared. The second group started from the bottom and hiked about one mile up the trail to begin work. This group of 6 used a hedge trimmer and a weed whacker to clear the trail. There was also a fair amount of tread work involved in cleaning up minor slides. About 3200 ft of trail was cleared. Although we didn't work the entire 2.5 miles of the Ray Miller trail, it's in good hiking shape and requires no further work at this time. Crew size: 11 Hours worked: 6 Total hours: 66 Total feet of trail worked: 5300