Event#: | 739 |
Date: | 2020-05-06 |
Agency: | NPS |
Trail: | Mishe Mokwa Trail |
Leader: | Jerry Mitcham |
Hours: | 12 |
Volunteers: | 3 |
Distance: | 75 |
Status: | Completed |
Regulars: | 3 |
Casuals: | 0 |
pdf: | 20200506MisheMokwa.pdf |
CSUCI: | 0 |
Tag: | BBT,CIRCLE X,Covid-19 |
Previous Events
ID |
Date |
Leader |
Hours |
748 | 2020-05-23 | Dave Edwards | 30.0 |
747 | 2020-05-21 | Barry Dydyk | 8.0 |
745 | 2020-05-16 | Dave Edwards | 36.0 |
744 | 2020-05-14 | Jerry Mitcham | 8.0 |
742 | 2020-05-13 | Norm Simmonds | 24.0 |
743 | 2020-05-12 | Jerry Mitcham | 9.0 |
741 | 2020-05-11 | Dave Edwards | 24.0 |
740 | 2020-05-08 | Dave Edwards | 18.0 |
739 | 2020-05-06 | Jerry Mitcham | 12.0 |
737 | 2020-05-04 | Jerry Mitcham | 13.5 |
738 | 2020-05-04 | Dave Edwards | 13.5 |
735 | 2020-04-30 | Jerry Mitcham | 12.0 |
736 | 2020-04-28 | Don Brusselars | 8.0 |
732 | 2020-04-28 | Barry Dydyk | 12.0 |
730 | 2020-04-22 | Jerry Mitcham | 12.0 |
731 | 2020-04-21 | Barry Dydyk | 13.5 |
603 | 2018-11-03 | Jerry Mitcham | 54.0 |
598 | 2018-10-06 | Dave Edwards | 72.0 |
551 | 2018-03-17 | George Sherman | 42.0 |
543 | 2018-02-03 | John Kross | 54.0 |
517 | 2017-10-28 | Barry Dydyk | 48.0 |
384 | 2016-01-30 | Greg Sweel | 54.5 |
Crew Member |
Hours |
Anne Russell | 4.00 |
Barry Dydyk | 4.00 |
Jerry Mitcham | 4.00 |
This was one of the specially scheduled COVID-19 trail maintenance projects. Since the park is closed on the weekends, we are only working on weekdays, with very small crews and practicing “social distancing”. We had 3 volunteers for this project. Met at the trailhead on Yerba Buena Road. Performed the GAR evaluation and conducted safety and tool talks. Hiked up the trail to the work site. Began work on that section of the trail below the connector to the Sandstone Peak Trail. Completed a new large drain began last outing. Filled approximately 50 feet of trenched tread. Began work on a new drain. Due to the extreme heat, we stopped work and began the hike down to the trailhead. Arrived back at the trailhead. Project complete. Total volunteer hours: 3 Volunteers x 4 hours = 12 hours Feet of trail maintained: 75 ft.