Event#:908
Date: 2022-11-19
Agency:State Parks
Trail: Old Boney Trail
Leader:Dave Edwards
Hours: 186
Volunteers:31
Distance:2100
Status: Completed
Regulars: 13
Casuals: 16
pdf:20221119BlueCanyon.pdf
CSUCI: 2
Tag:PMSP, BBT, CSUCI_TC, CSUCI
Previous Events on this Trail
ID Date Leader Hours
9082022-11-19Dave Edwards186.0
8012021-04-17George Sherman42.0
7982021-04-10Greg Sweel42.0
7962021-04-03Dave Edwards91.0
7952021-03-27John Kross49.0
7932021-03-20Greg Sweel42.0
7912021-03-13Dave Edwards78.0
7902021-03-06John Kross65.0
7892021-02-27George Sherman56.0
7202020-02-01Barry Dydyk54.0
6962019-10-06George Sherman12.0
6952019-10-05George Sherman66.0
6932019-09-29George Sherman6.0
6902019-09-25George Sherman30.0
6892019-09-22George Sherman6.0
6882019-09-18George Sherman53.0
6912019-09-15George Sherman5.0
6872019-09-14George Sherman50.0
6862019-09-08George Sherman6.0
6842019-08-31George Sherman12.0
6832019-08-25George Sherman5.0
6822019-08-24George Sherman18.0
6812019-08-18George Sherman5.0
6792019-08-11George Sherman6.0
6782019-08-10George Sherman6.0
5402018-01-17Norm Simmonds24.0
5322017-12-02George Sherman54.0
5082017-09-23Greg Sweel60.0
5072017-09-16John Kross42.0
4492016-12-07Norm Simmonds28.0
4072016-05-11Norm Simmonds36.0
3852016-02-20Jerry Mitcham66.0
3692015-12-09Norm Simmonds54.0
3642015-11-11Norm Simmonds48.0
1622013-04-2074.0
1392013-04-1354.0
1302013-03-0954.0
1242013-02-096.0
1232013-01-2354.0
1092013-01-0542.0
1062012-12-1537.5
832012-10-1348.0
802012-09-2456.0
792012-09-2266.0
772012-09-1945.5
682012-06-2348.0
Crew Member Hours
Anne Russell6.00
Barry Dydyk6.00
Bridgette Bagheri6.00
Dave Edwards6.00
Denise Pomonik6.00
George Sherman6.00
Greg Sweel6.00
John Kross6.00
Jon Sheldon6.00
Kirsten Rosselot6.00
Roger Young6.00
Ruth Feldon6.00
Viviana Celaya6.00
Crew leader: Dave Edwards Summary: We met at Wendy and Potrero Rd at 8:30 and drove to the Danielson multi-use camping area. It took six vehicles to transport some 31 volunteers. There was 12 of our regular trail workers and some 15 or so ultra-trail runners from Keira Henninger’s group along with two from CSCI Trail Corps. We hiked about 1.4 miles up the Blue Canyon and Old Boney trail toward the Chamberlain Rock trail to begin work. It was a very windy but otherwise nice day and a little on the cool side. We worked on the section of trail where we’ve had several slides in the past with lots of rocks of various sizes on the trail. All of these bad sections were cleared along with most all of the loose rocks. We cleaned several water drains and installed a few more new ones. So this whole section all the way up from the creek crossing to where the trail makes a big turn to the left was cleared. Nearly 2100 feet of trail. Hours worked: 6 Crew size: 31 Total hours: 186
image from our trail work event