Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:914
Date: 2022-12-17
Agency:State Parks
Trail: Wood Canyon Vista Trail
Leader:Anne Russell
Hours: 84
Volunteers:14
Distance:2323
Status: Completed
Regulars: 10
Casuals: 4
pdf:20221217WoodCanyonVista.pdf
CSUCI: 0
Tag:PMSP, CSUCI_TC
Previous Events on this Trail
ID Date Leader Hours
9142022-12-17Anne Russell84.0
9072022-11-12John Kross141.0
8352021-12-18John Kross96.0
6982019-10-12Dave Edwards48.0
2992015-02-21George Sherman228.0
1502013-06-0884.0
1632013-04-2012.0
Crew Member Hours
Anne Russell6.00
Bridgette Bagheri6.00
Cindy Kimmick6.00
Dave Edwards6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
John Kross6.00
Jon Sheldon6.00
Juan Carlo Mendoza6.00
Peter Sullivan6.00
Ruth Feldon6.00
CORBA members and other newer volunteers joined SMMTC for this event. We had 4 occasional volunteers and 10 regulars (including Steve Messer of CORBA and Bridgette Baghari of Trail Corp) for a total of 14. State Parks ranger Jason Finlay joined to provide and supervise 2 battery-powered rock drills. We shuttled to the trailhead from the Wendy and Potrero lot in 5 vehicles. One crew consisting of 3 works plus Jason continued work on removing a very large boulder that juts into the trail and is blocking CSP from sending the Sweco along the trail. The other three crews cleared slough, removed rocks, widened the trail, and repaired ruts, working up from where we had stopped on 11/12/22. We installed a total of 10 drains, and covered .44 miles. It should be noted for the record that we saw a high-speed, possibly manned, white fixed-wing aircraft fly through the canyon at a very low altitude in the midmorning. We shuttled back to Wendy and Potrero at about 2:15. Total volunteer hours: 14 x 6 = 84 Feet maintained: 2323.2
image from our trail work event