Event#:940
Date: 2023-04-06
Agency:State Parks
Trail: Dead Horse Trail
Leader:Jerry Mitcham
Hours: 7
Volunteers:3
Distance:100
Status: Completed
Regulars: 3
Casuals: 0
pdf:20230406DeadHorse.pdf
CSUCI: 0
Tag:TSP, BBT
Previous Events on this Trail
ID Date Leader Hours
9422023-04-15Don Brusselars72.0
9412023-04-08Jerry Mitcham72.0
9402023-04-06Jerry Mitcham7.5
9362023-03-27Jerry Mitcham2.5
712012-03-1078.0
Crew Member Hours
Jerry Mitcham2.50
Jon Sheldon2.50
Ruth Feldon2.50
This was an unscheduled event to perform activities to prepare for the trail maintenance project scheduled for the Dead Horse Trail April 8, 2023. Three SMMTC volunteers (Jerry Mitcham, Ruth Feldon and Jon Sheldon) participated. Met at the Dead Horse Trail head. Carpooled to the 92 Trail Head. Unloaded trail maintenance materials and mounted on a two wheeled cart. The materials consisted of 4, 4 foot timbers and several pieces of rebar. Used the cart to haul the materials 0.6 miles to the Saturday work site. Hauling the materials over the poorly maintained trail proved to be difficult and time consuming. Delivered the materials to the work site and hiked back to the trail head.. Completed the event. Total SMMTC volunteer hours: 3 Volunteers x 2.5 hours = 7.5 hours Feet of trail maintained: NA
2 images, scroll down to see susbsequent images.image from our trail work eventimage from our trail work event