Event#: | 952 |
Date: | 2023-04-22 |
Agency: | State Parks |
Trail: | Santa Monica Mountains Trail Days, Sycamore Canyon |
Leader: | Barb Thomas |
Hours: | 714 |
Volunteers: | 119 |
Distance: | 14000 |
Status: | Completed |
Regulars: | 20 |
Casuals: | 99 |
pdf: | 20230422TrailDaysSaturday.pdf |
CSUCI: | 0 |
Tag: | PMSP, BBT, CSUCI_TC |
Previous Events on this Trail
ID |
Date |
Leader |
Hours |
953 | 2023-04-23 | Barb Thomas | 414.0 |
952 | 2023-04-22 | Barb Thomas | 714.0 |
951 | 2023-04-21 | Barb Thomas | 16.0 |
488 | 2017-04-30 | Jerry Mitcham | 60.0 |
487 | 2017-04-29 | Jerry Mitcham | 216.0 |
486 | 2017-04-28 | Jerry Mitcham | 24.0 |
485 | 2017-04-27 | Jerry Mitcham | 24.0 |
484 | 2017-04-26 | Dave Edwards | 4.0 |
Crew Member |
Hours |
Barb Thomas | 16.00 |
Barry Dydyk | 7.50 |
Carlyn Taggart | 17.00 |
Cindy Kimmick | 6.00 |
Dave Edwards | 7.50 |
Dave Perlmutter | 6.00 |
Denise Pomonik | 7.50 |
Don Brusselars | 7.50 |
George Sherman | 7.50 |
Greg Sweel | 7.50 |
Jerry Mitcham | 7.50 |
John Kross | 7.50 |
John Reynolds | 7.50 |
Jon Sheldon | 7.50 |
Jon Van Gorder | 7.50 |
Juan Carlos Mendoza | 7.50 |
Ruth Feldon | 7.50 |
Solomon Adams | 6.00 |
Steve Clark | 7.50 |
Viviana Celaya | 6.00 |
Volunteers began to arrive and sign in
Multiple groups/organizations with leaders led crews on different trails: Volunteers were organized into several crews. Crews were shuttled to various trail heads, assigned crew leaders and issued tools. The crewleaders conducted tool talk and safety briefings to their respective crews. The trails, crews and work accomplishments were as follows:
SMMTC: Four Crews; Blue Canyon Trail.:
Three crews with a total of 42 volunteers and 3 NPS crew worked the upper portion of the Blue Canyon Trail. Three volunteers worked ahead of the other volunteers with a gas powered weed whacker and two followers. The remaining crewmembers performed routine brushing and tread work. A temporary stream crossing was widened and improved. Removed soil was used to fill a 150 stretch of trench in the trail. A four hundred foot section of the old Boney Trail was also weed whacked/brushed.
The forth crew consisting of 26 kids and 13 adults worked on the lower section of the Blue Canyon Trail performing light brushing and general clean-up.
Total volunteer hours: (81 volunteers x 6 hours) = 486 hours
Feet of trail maintained: 6,860
CORBA: Sin Nombre Trail: 25 volunteers. The crew installed 7 new drains and built a retaining wall to repair severe erosion issues. Closed off an unauthorized “shortcut trail”.
Total volunteer hours: (25 volunteers x 6 hours) = 150 hours
Feet of trail maintained: 2,640
Sierra Club Task Force: Lower Coyote Trail; 21 volunteers: Performed general trail maintenance. Primarily brushing and slough removal...
Total volunteer hours: (21 volunteers x 6 hours) = 126 hours
Feet of trail maintained: 1,056
SMMTC One crew: Upper Coyote Trail: 22 Volunteers. General trail maintenance, primarily brushing and light tread work
Total volunteer hours: (22 volunteers x 6 hours) = 132 hours
Feet of trail maintained: 1,160
Scout Troop 111: La Jolla Valley Loop Trail; 16 Volunteers. Supervised by Jason Finely. Weed whacked and cleared brush on 3,000 feet of trail...
Total volunteer hours: (16 volunteers x 6 hours) = 96 hours
Feet of trail maintained: 3,000
Total volunteer hours for Saturday = 1,031 hours
Feet of trail maintained:= 14,716 (2.8 mi)