Event#: | 429 |
Date: | 2016-09-17 |
Agency: | NPS |
Trail: | BBT Near Yerba Buena Road |
Leader: | Jerry Mitcham |
Hours: | 120 |
Volunteers: | 20 |
Distance: | 1580 |
Status: | Completed |
Regulars: | 9 |
Casuals: | 11 |
pdf: | 20160917BBT_NearYerbaBuena.pdf |
CSUCI: | 0 |
Tag: | BBT, CIRCLE X |
Previous Events
ID |
Date |
Leader |
Hours |
429 | 2016-09-17 | Jerry Mitcham | 120.0 |
Crew Member |
Hours |
Anne Russell | 6.00 |
Barry Dydyk | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Norm Simmonds | 6.00 |
Sharon Simmonds | 6.00 |
This was a scheduled project with the UC Outfitters Club of USC. The object of the project was to perform routine trail maintenance on the BBT. There were 8 UC students and 12 SMMTC volunteers present. 8:30 AM Met at the large dirt pull out at the 9.0 mile marker on Yerba Buena Road. Held introductions, project briefing, tool talk and safety briefing. 8:45 AM Began work. We accessed the trail about 0.1 mile from the Yerba Buena trailhead. We performed light lopping, removed slough, roots/stumps and cleaned the drains at the four switchbacks. 2:00 PM Completed work. Hiked back to the meeting place. Total volunteer hours: 20 Volunteers x 6 hours = 120 hours Feet of trail maintained: 1,580