Event#: | 609 |
Date: | 2018-12-08 |
Agency: | State Parks |
Trail: | Leo Carrillo State Park |
Leader: | John Kross |
Hours: | 108 |
Volunteers: | 18 |
Distance: | 11035 |
Status: | Completed |
Regulars: | 8 |
Casuals: | 10 |
pdf: | 20181208LeoCarrillo.pdf |
CSUCI: | 10 |
Tag: | LCSP, CSUCI, Woolsey_Fire |
Previous Events
ID |
Date |
Leader |
Hours |
609 | 2018-12-08 | John Kross | 108.0 |
516 | 2017-10-14 | John Kross | 138.0 |
398 | 2016-04-16 | Jerry Mitcham | 130.5 |
392 | 2016-03-16 | Norm Simmonds | 60.0 |
388 | 2016-03-12 | John Kross | 132.0 |
Crew Member |
Hours |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
John Kross | 6.00 |
Norm Simmonds | 6.00 |
Sharon Simmonds | 6.00 |
This was an outing with the students from CSUCI. 10 students attended this trailwork event. In addition, 8 of SMMTC's regular volunteers participated. I split the group of students into 2 groups of 5, Dave Edwards led one of the groups of five students and two regular volunteers up the Nicholas Flats trail. The other 5 students and 4 regular volunteers proceeded with me up the Willow Creek trail. In addition, Jason from State Parks escorted us and he came with me on the Willow Creek trail. Proceeded to the trails. The rocks and debris we had identified last Monday had mostly been washed off the trail by the rain. Instead, we found a lot of slough and silt built up on the trail and we focused on trail clean-up. On the Willow Creek, we built up 4 washouts with rocks, added 3 new drains and restored 3 others. Also, we filled in a long rut near the top. On the Nicholas Flats, Dave and his crew added 5 new drains and restored 25. At 11:30 we took a lunch break, we led the students to the top of the hill and had lunch while enjoying the magnificent 360 degree view. We resumed work at 12:15 and headed out shortly after 1:30. We were back at the cars and departed at 2:30. Total Volunteer Hours: 18 Volunteers x 6 hours = 108 hours Feet of trail maintained: 11,035