Event#: | 702 |
Date: | 2019-11-02 |
Agency: | NPS |
Trail: | Backbone Trail, Upper Zuma Canyon, NPS |
Leader: | Greg Sweel |
Hours: | 74 |
Volunteers: | 12 |
Distance: | 2100 |
Status: | Completed |
Regulars: | 8 |
Casuals: | 4 |
pdf: | 20191102UpperZuma.pdf |
CSUCI: | 0 |
Tag: | BBT |
Previous Events
ID |
Date |
Leader |
Hours |
702 | 2019-11-02 | Greg Sweel | 74.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Greg Sweel | 8.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Jon Sheldon | 6.00 |
Norm Simmonds | 6.00 |
Sharon Simmonds | 6.00 |
Arrive at pull-out approximately ΒΌ mile north of Tunnel #1 on Kanan Road. Pass the sign-in sheet, distribute tools and discuss logistics. Hiked down to creek crossing with some lopping, drain repair/installation and removal of loose rocks along the way. West of the creek, we installed and repaired several drains and water diversions. A buried culvert was located, excavated, and restored to functionality. Additional drains were cleaned and ruts were filled in. Take lunch break. Resume work improving tread, widening trail, filling in ruts. Stop work and hiked back to the parking lot. Return tools. End of work day. 12 volunteers x 6 hours = 72 hours (see sign-in sheet) 1 volunteer (Crew Leader) + 2 hours for surveying trail on 10/19/19 and phone discussions with Mike Zenan (NPS). Total distance maintained = 2100 feet.