Event#: | 802 |
Date: | 2021-04-24 |
Agency: | State Parks |
Trail: | La Jolla Valley Trails |
Leader: | Jerry Mitcham |
Hours: | 66 |
Volunteers: | 11 |
Distance: | 1670 |
Status: | Completed |
Regulars: | 10 |
Casuals: | 1 |
pdf: | 20210424LaJollaCynTrail.pdf |
CSUCI: | 0 |
Tag: | PMSP |
Previous Events
ID |
Date |
Leader |
Hours |
815 | 2021-06-26 | Dave Edwards | 67.0 |
814 | 2021-06-19 | Greg Sweel | 49.0 |
813 | 2021-06-12 | Jerry Mitcham | 103.5 |
812 | 2021-06-05 | Don Brusselars | 66.0 |
811 | 2021-05-29 | John Kross | 72.0 |
810 | 2021-05-22 | Greg Sweel | 90.0 |
804 | 2021-05-08 | Dave Edwards | 70.0 |
805 | 2021-05-08 | Jerry Mitcham | 18.0 |
803 | 2021-05-01 | John Kross | 72.0 |
802 | 2021-04-24 | Jerry Mitcham | 66.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Jon Sheldon | 6.00 |
Norm Simmonds | 6.00 |
Rolf Henriksson | 6.00 |
This was one of the specially scheduled COVID-19 trail maintenance projects. Today, our two crews of the last few weeks joined to work together. The goal of this project was to perform routine trail maintenance on the La Jolla Canyon Trail. We had 11 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the northern La Jolla Valley group camp area. Began work at the point where the crew left off last week. Used the power tools to trim brush back to the standard 8’ width. Performed maintenance on a total of 1,670 ft. of trail. Tread work consisted of primarily of removing roots and stumps from the trail. We found moderately heavy brush consisting of a mix of deer weed, sage misc other brush and grasses. We cut the grasses we skipped over last week Going forward from where we left off there is a lot of brushing to be done. The tread is only about two feet wide, but in good shape.. Stopped work. Hiked back to the trail head, then carpooled back to the meeting place. . Arrived back at the meeting place. Project complete. Total volunteer hours: 11 Volunteers x 6 hours = 66 hours Feet of trail maintained: 1,670 ft.