Event#:939
Date: 2023-04-04
Agency:State Parks
Trail: Saddle Creek
Leader:Jerry Mitcham
Hours: 54
Volunteers:9
Distance:300
Status: Completed
Regulars: 9
Casuals: 0
pdf:20230404BBT_SaddleCreek.pdf
CSUCI: 0
Tag:MCSP, BBT
Previous Events on this Trail
ID Date Leader Hours
9392023-04-04Jerry Mitcham54.0
9372023-03-24Jerry Mitcham6.0
9292023-02-18Barry Dydyk90.0
9282023-02-11Anne Russell84.0
9252023-02-04Greg Sweel132.0
7192020-01-25Jerry Mitcham36.0
7072019-11-23Greg Sweel192.0
6492019-05-25Jerry Mitcham54.0
6342019-04-13Greg Sweel38.5
6302019-03-30George Sherman72.0
4992017-06-28Dave Edwards42.0
4972017-06-17Jerry Mitcham60.0
4642017-02-11Dave Edwards48.0
4102016-03-05Barb Thomas60.0
3262015-05-02Greg Sweel24.0
2202014-04-05Greg Sweel48.0
1802013-10-12Greg Sweel30.0
532012-03-3172.0
352012-02-0483.5
32011-09-1735.0
Crew Member Hours
Dave Edwards6.00
Denise Pomonik6.00
Don Brusselars6.00
Jerry Mitcham6.00
John Kross6.00
John Reynolds6.00
Jon Sheldon6.00
Juan Carlos Mendoza6.00
Ruth Feldon6.00
This was a specially scheduled trail maintenance event to address storm damage to the BBT-Saddle Creek Trail in Malibu Creek State Park. A trail assessment was conducted previously to assess the scope of the problem area and determine the most effective solution. Today’s work addressed a section of trail with one very large washout and other poor drainage problems. The very large washout was 20.5’ long, varying 3’ to 7’ wide and varying 3’ to 6’ deep. This made the trail impassable and trail users have been diverting upslope to get around the hole, creating a very dangerous situation. Today we had nine SMMTC volunteers and the State Parks Trail crew consisting of Trail Coordinator Jason Finley and three others, for a total crew of 13. Met at the BBT trail head on Stunt Road. Conducted event briefings and safety and tool talks. Hiked approximately 1.5 miles toward Piuma Road to the work site. The work was totally tread work. The repair work consisted of constructing a retaining wall approximately 6’ high, backfilling with rock and a very large amount of soil. The wall and fill materials were mostly extracted from a trailside berm above the washout. The portion of trail where the berm was removed was carefully groomed to provide an out sloop, thereby improving the drainage. In the process many feet of trenches were filled to improve the tread. Completed work and returned to the meeting place. Completed the day’s event. Total SMMTC volunteer hours: 9 Volunteers x 6 hours = 54 hours Feet of trail maintained: 300
19 images, scroll down to see susbsequent images.image from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work eventimage from our trail work event